Wind Turbine Upgrade

An upgrade from an earlier model of a wind turbine by the same manufacturer, Endurance Wind Power.

  • Date: March 2012
  • Client: Homeowner, Plympton
  • Project Type: Wind Turbine Installation

About this Project

This client installed an Endurance S-343 5kW residential wind turbine. This model was an upgrade to his original wind turbine, an Endurance S-250. We were happy to help this client, a long-term client of SAGE, to get his turbine up and running. 

This project included a custom hydraulic winch made to assist with raising and lowering the turbine.

 

  • Wind turbine decommission and removal
  • Installation of a new wind turbine
  • System commissioning
  • Removal and recycling of old equipment and materials

Request Quote

If you’re ready for a site assessment or need our services, please use our request form. We’ll do our best to respond within 2 business days.

Warehouse and office in Windsor, Nova Scotia.

902.306.1200

hello@sage-energy.ca